
Featured
Projects
A selection of construction inspection and contract administration work delivered for public infrastructure clients across Indiana.

Runway 14-32 & Taxiway M Rehabilitation
Construction inspection and quality assurance for FAA P-401 HMA paving and airfield lighting upgrades at Indianapolis International Airport, with paving performed inside overnight runway closures.

Taxiway G Rehabilitation
Construction inspection and materials testing for the 2020 rehabilitation of Taxiway G at Indianapolis International Airport, to FAA and airport authority standards.

Hoosier Heartland Highway · SR 25
Construction inspection along the SR 25 corridor near Tippecanoe and Carroll Counties, including grade-separation structures over the highway and the Norfolk Southern Railroad.

SR 32 Improvements
Passing and auxiliary lanes, HMA overlay with minor structural work, access control, and eight small structure replacements on SR 32 between SR 75 and I-65.

New Palestine Roundabout
Construction inspection for a new roundabout intersection in New Palestine, Indiana, improving safety and traffic flow at a key local crossing.

Bridgeport Interceptor Storage Facility
Construction inspection and contract administration for a major wet-weather storage facility, monitoring soldier pile and lagging support, large-diameter HDPE fusion welding, pressure testing, and leak detection.

Lift Station 101 Force Main Replacement
Owner's representative for the replacement of an aging wastewater force main along Challenger Drive and Old Thompson Road, with daily inspection, contract administration, and full closeout, all while keeping service uninterrupted.

New Belmont Ferrous Building
Purpose-built chemical storage and feed facility for ferrous sulfate at the Belmont WWT Plant, replacing aging basement tanks with a corrosion-resistant, fully SCADA-integrated facility.

AWT Effluent Filter Improvement – Phase 1
Phase 1 rehabilitation of tertiary sand filter systems at the Belmont and Southport WWTPs, VFD replacements, butterfly valve installations, and manual backup control panels integrated into plant SCADA.

AWT Solids Management Improvements
Added a 6th centrifuge at the Belmont WWTP to restore true standby dewatering capacity and future-proof the facility against increasing solids loading.

Belmont & Southport ONS Wall Tie Replacement
Replaced aging 1980s steel wall ties at aeration tanks and secondary clarifiers across two plants with new exterior support structures, completed ahead of schedule with zero safety incidents.

Plantwide Filter Rehab – Phase 2
The $20M second phase of the plantwide tertiary filter rehabilitation at the Belmont and Southport plants, modernizing the facilities' final filtration systems.

Primary Clarifiers 1-6 Rehabilitation
Rehabilitation of six primary clarifiers at the Belmont plant, restoring aging mechanical and structural components to extend the service life of primary treatment.

Cake Pump 1-4 Replacement
Replacement of four cake pumps in the Belmont plant's dewatering process, renewing critical solids-handling equipment with minimal impact to operations.

Primary Clarifiers 7&8 Rehabilitation
Rehabilitation of two additional primary clarifiers at the Belmont plant, continuing the restoration of aging primary treatment infrastructure.
Ready to Add Your Project to the List?
Let's discuss what FGI can do for your next infrastructure challenge.
