Our Work

Featured
Projects

A selection of construction inspection and contract administration work delivered for public infrastructure clients across Indiana.

AllAviationWastewaterTransportation
Runway 14-32 & Taxiway M Rehabilitation
Aviation
Indianapolis Airport Authority
~3,000 tons/shift

Runway 14-32 & Taxiway M Rehabilitation

Construction inspection and quality assurance for FAA P-401 HMA paving and airfield lighting upgrades at Indianapolis International Airport, with paving performed inside overnight runway closures.

AviationFAA P-401 HMAActive Airfield
View →
Taxiway G Rehabilitation
Aviation
Indianapolis Airport Authority
Inspection & Materials Testing

Taxiway G Rehabilitation

Construction inspection and materials testing for the 2020 rehabilitation of Taxiway G at Indianapolis International Airport, to FAA and airport authority standards.

AviationTaxiwayMaterials Testing
View →
Hoosier Heartland Highway · SR 25
Transportation
INDOT
Grade Separations

Hoosier Heartland Highway · SR 25

Construction inspection along the SR 25 corridor near Tippecanoe and Carroll Counties, including grade-separation structures over the highway and the Norfolk Southern Railroad.

TransportationBridgeINDOT
View →
SR 32 Improvements
Transportation
INDOT
8 Structure Replacements

SR 32 Improvements

Passing and auxiliary lanes, HMA overlay with minor structural work, access control, and eight small structure replacements on SR 32 between SR 75 and I-65.

TransportationHMA PavingINDOT
View →
New Palestine Roundabout
Transportation
INDOT
Roundabout

New Palestine Roundabout

Construction inspection for a new roundabout intersection in New Palestine, Indiana, improving safety and traffic flow at a key local crossing.

TransportationRoundaboutINDOT
View →
Bridgeport Interceptor Storage Facility
Wastewater
Citizens Energy Group
HDPE / Deep Excavation

Bridgeport Interceptor Storage Facility

Construction inspection and contract administration for a major wet-weather storage facility, monitoring soldier pile and lagging support, large-diameter HDPE fusion welding, pressure testing, and leak detection.

WastewaterHDPE PipeDeep Excavation
View →
Lift Station 101 Force Main Replacement
Wastewater
Citizens Energy Group
Force Main Replacement

Lift Station 101 Force Main Replacement

Owner's representative for the replacement of an aging wastewater force main along Challenger Drive and Old Thompson Road, with daily inspection, contract administration, and full closeout, all while keeping service uninterrupted.

WastewaterForce MainOwner's Rep
View →
New Belmont Ferrous Building
Wastewater
Citizens Energy Group
$2,657,000

New Belmont Ferrous Building

Purpose-built chemical storage and feed facility for ferrous sulfate at the Belmont WWT Plant, replacing aging basement tanks with a corrosion-resistant, fully SCADA-integrated facility.

Water/WastewaterChemical FeedNew Construction
View →
AWT Effluent Filter Improvement – Phase 1
Wastewater
Citizens Energy Group
$4,875,000

AWT Effluent Filter Improvement – Phase 1

Phase 1 rehabilitation of tertiary sand filter systems at the Belmont and Southport WWTPs, VFD replacements, butterfly valve installations, and manual backup control panels integrated into plant SCADA.

Water/WastewaterFilter RehabMulti-Plant
View →
AWT Solids Management Improvements
Wastewater
Citizens Energy Group
$1,820,000

AWT Solids Management Improvements

Added a 6th centrifuge at the Belmont WWTP to restore true standby dewatering capacity and future-proof the facility against increasing solids loading.

Water/WastewaterDewateringCapacity Expansion
View →
Belmont & Southport ONS Wall Tie Replacement
Wastewater
Citizens Energy Group
$9,264,000

Belmont & Southport ONS Wall Tie Replacement

Replaced aging 1980s steel wall ties at aeration tanks and secondary clarifiers across two plants with new exterior support structures, completed ahead of schedule with zero safety incidents.

Water/WastewaterStructuralMulti-Plant
View →
Plantwide Filter Rehab – Phase 2
Wastewater
Citizens Energy Group
$20,000,000

Plantwide Filter Rehab – Phase 2

The $20M second phase of the plantwide tertiary filter rehabilitation at the Belmont and Southport plants, modernizing the facilities' final filtration systems.

Water/WastewaterFilter RehabMulti-Plant
View →
Primary Clarifiers 1-6 Rehabilitation
Wastewater
Citizens Energy Group
$3,755,000

Primary Clarifiers 1-6 Rehabilitation

Rehabilitation of six primary clarifiers at the Belmont plant, restoring aging mechanical and structural components to extend the service life of primary treatment.

Water/WastewaterClarifiersRehab
View →
Cake Pump 1-4 Replacement
Wastewater
Citizens Energy Group
$3,622,000

Cake Pump 1-4 Replacement

Replacement of four cake pumps in the Belmont plant's dewatering process, renewing critical solids-handling equipment with minimal impact to operations.

Water/WastewaterDewateringMechanical
View →
Primary Clarifiers 7&8 Rehabilitation
Wastewater
Citizens Energy Group
$2,205,000

Primary Clarifiers 7&8 Rehabilitation

Rehabilitation of two additional primary clarifiers at the Belmont plant, continuing the restoration of aging primary treatment infrastructure.

Water/WastewaterClarifiersRehab
View →

Ready to Add Your Project to the List?

Let's discuss what FGI can do for your next infrastructure challenge.